Honeywell UDA2182 TV Converter Box User Manual


 
Unpacking
January 2009 UDA2182 Universal Dual Analyzer Product Manual 13
Pipe Mounting
The analyzer can be mounted vertically or horizontally on a pipe. Use the bracket and
hardware supplied in the mounting kit.
Select 1 inch or 2 inch U-Bolts.
ATTENTION
Pipe mounting is not recommended if the pipe is subject to severe vibration. Excessive
vibration may affect system performance.
1 or 2 inch Vertical Rear Pipe Mounting
188.1
[7.40]
195.1
[7.68]
97.5
[3.84]
77.4
[3.05]
156
[6.14]
97.5
[3.84]
1 or 2 inch Horizontal Rear Pipe Mounting
188.1
[7.40]
97.5
[3.84]
78
[3.07]
78
[3.07]
M8 Nut
M8 Lock Washer
M8 Flat Washer
M5 X 10mm long screw with M5 lock washer (2 places)
Note orientation of hole and slot in mounting bracket.
Hole is to be in the upper position.
Do not over
tighten fasteners
4.5Nm (40 Lb-in) of
torque max.
1 or 2 inch Vertical Rear Pipe Mounting
188.1
[7.40]
195.1
[7.68]
97.5
[3.84]
77.4
[3.05]
156
[6.14]
97.5
[3.84]
1 or 2 inch Horizontal Rear Pipe Mounting
188.1
[7.40]
97.5
[3.84]
78
[3.07]
78
[3.07]
M8 Nut
M8 Lock Washer
M8 Flat Washer
M5 X 10mm long screw with M5 lock washer (2 places)
Note orientation of hole and slot in mounting bracket.
Hole is to be in the upper position.
Do not over
tighten fasteners
4.5Nm (40 Lb-in) of
torque max.
Figure 3-3 Pipe Mounting Dimensions (not to scale)