Avaya S8300 Home Theater Server User Manual


 
Post-upgrade tasks
Issue 9.1 June 2006 663
Complete the upgrade process
(S8300 is the primary controller)
In an SSH session to the S8300 (primary controller), access the SAT command line interface to
complete the following procedures.
To check media modules
1. Type list configuration all and press Enter.
2. Verify that the software is communicating with all media modules and that all media
modules are listed in the reports.
3. Make test telephone calls to verify that Communication Manager is working.
To enable scheduled maintenance
1. Type change system-parameters maintenance and press Enter.
2. Ensure that the Start Time and Stop Time fields' administration is the same as before the
upgrade.
To busy out trunks
1. Busy out trunks that were busied out before the upgrade (see Pre-Upgrade Tasks — If the
S8300 is the primary controller on page 604).
To check for translation corruption
1. Type newterm and press Enter.
If you do not get a login prompt and see the following message:
Warning: Translation corruption detected
follow the normal escalation procedure for translation corruption before continuing the
upgrade.
To resolve alarms
1. On the Maintenance Web Interface, under Alarms click Current Alarms to examine the
alarm log.
2. If any alarms are listed, click Clear All.
3. Resolve new alarms since the upgrade through Communication Manager using the
appropriate maintenance reference.