Hardware installation for the G700 Media Gateway and S8300 Media Server
102 Installing and Upgrading the Avaya G700 Media Gateway and Avaya S8300 Media Server
Figure 7: Avaya G700 Media Gateways
Preparing the G700 media gateway
The instructions that follow guide you through a process of preparing the Avaya G700 Media
Gateway after you have mounted the empty chassis in the rack. It is possible to equip an empty
G700 chassis before positioning it in the rack. If you are working where space is limited, you
may wish to prepare the G700 before rack insertion.
!
CAUTION:
CAUTION: When handling any components of an S8300 Media Server with G700 Media
Gateways, wear an anti-static wrist ground strap. Connect the strap to an
approved ground such as an unpainted metal surface.
ALM
TST
ACT
123456 87
ALM
TST
ACT
123456 87
E1/T1 EIA 530A DCE
ALM
TST
ACT
SIG
EISO EMSM EOSI
ALM
TST
ACT
123456 87
ALM
TST
ACT
123456 87
E1/T1 EIA 530A DCE
ALM
TST
ACT
SIG
EISO EMSM EOSI
ALM
TST
ACT
123456 87
ALM
TST
ACT
123456 87
E1/T1 EIA 530A DCE
ALM
TST
ACT
SIG
EISO EMSM EOSI
ALM
TST
ACT
123456 87
ALM
TST
ACT
123456 87
REMOVE
ALM
TST
ACT
OK TO
SHUT DOWN
SERVICES USB 1 USB 2
E1/T1 EIA 530A DCE
ALM
TST
ACT
SIG
EISO EMSM EOSI
scdcrck4 LAO 030203