Emerson Process Management GmbH & Co. OHG 7-17
X-STREAM XE
Instruction Manual
HASXEE-IM-HS
10/2010
7
Maintenance & Procedures
7.4.2 Manual Calibration
7.4.2 Manual Calibration
7.4.2.1 Manual Zero Calibration
Starting from the MEASUREMENT SCREEN
press
down to open the MAIN MENU and
enter CONTROL.
To start a zero calibration select the rst
line
:
Multi-channel unit:
Select the channel to be calibrated in
SELECT COMPONENT.
Before selecting any further
line make sure the required
calibration gas is applied and
owing!
Supply all calibration gases
with the same ow as the samp-
le gas (recommeded approx. 1 l/
min), pressureless and utilizing
the correct gas tting ( sect.
3.4).
Ensure the warm-up time after
switching on has elapsed!
Warm-up time is 15 to 50 minutes
depending on installed measu-
ring system and conguration!
The rst line gives you the choice to cancel
the procedure now.
Select the second line to start the calibra-
tion.
Control..
Zero calibration..
Span calibration..
Advanced calibration..
Apply gas..
Lock menus!
Acknowledgements
Pump 1: Off
Pump 2: Off
Ranges..
Ch1
Zero calibration
Cancel!
Start!
Zero gas 0.000 ppm
Concentration 0.000 ppm
Flow 0.00 l/min
Status..
Results..
Restore!