Emerson Process Management GmbH & Co. OHG 1-21
X-STREAM XE
Instruction Manual
HASXEE-IM-HS
04/2010
1.7 X-STREAM XE Field Housing
Fig. 1-10: X-STREAM XEF - Right Side and Bottom View
1 Cable gland for power cable
2 Cable glands for signal cables
3 4 brackets for wall-mounting
4 Gas in- & outlets (max. 8)
5 Cutouts, to combine 2 housings (here closed)
21 3 5 4 5
Note!
In case of XDF, the cable glands are
located at the upper compartment, while
the gas in- & outlets are at the bottom
side of the lower compartment.
Also only 2 brackets are at each com-
partment.
1
Technical Description