IBM ibm Home Theater Server User Manual


 
3745 MAPs
009
Exchange the PS2. Go to “PS2 and
Primary Power Box Exchange
Procedure” on page 4-69.
010
Check the position of the CB1 on the
primary power box. Refer to Figure 4-1
on page 4-3 for location.
Is the CB1 in the ON position?
Yes No
011
Switch the CB1 ON.
Power ON the 3745.
Is the 3745 powering ON now?
Yes No
012
Go to Step 001 on page 2-21
013
Go to “CE Leaving Procedure” on
page 4-102.
014
Check the ac main voltage:
Power the 3745 OFF as follows:
Put the power control in local
mode:
- Using Power Control, scroll
till the value is 3.
- Press Validate.
Press Power Off.
Refer to Figure 4-35 on page 4-30
and do the following:
Remove the PS1 input power cord at
the Primary power box connector J1.
Connect a voltmeter to J1.
Press Power On Reset.
You have approximately two seconds
to read the ac voltage.
Is the voltage correct?
Yes No
015
Check for one of the following:
If the machine is correctly wired
for the customer's input voltage.
If you have a short circuit in the
primary control box.
If the customer's supply is
defective.
016
Exchange the PS2. Go to “PS2 and
Primary Power Box Exchange Procedure”
on page 4-69.
017
Check Fuse 1. Refer to Figure 4-37 on
page 4-32 for location.
Is the fuse OK?
Yes No
018
Switch CB1 OFF.
Exchange the fuse.
Switch CB1 ON.
If the fuse blows again, exchange the
FRU group 37.
Go to “3745 FRU Group Table” on
page 1-49.
If not, re-initiate the operation.
019
Measure the dc voltages at 01A-A1-J3 (Location
: 01b, refer to Figure 4-1 on page 4-3.)
VDC Vmin Vmax Test Point
+ 5.00 + 4.75 + 5.25 pin 22
+28.00 +24.90 +29.50 pin 21
AB
C
DE
01A-A1-J3
01A-Y0
1
13
25
14
28 V
5 V
Are both voltages present and within toler-
ance?
Yes No
020
(Step 020 continues)
2-22 3745 Models 130 to 17A: MIP