IBM ibm Home Theater Server User Manual


 
3745 FRU Exchange Procedure
Installation Procedure
1. Install the new EPO assembly and fasten it
with the four screws 8.
2. Reconnect the cable 7.
3. Re-install the PS2 cover 4 with the four
screws 3.
4. Slide the primary power box in the frame and
fasten it with the four screws 2.
5. Reconnect the ground wire 1 to the frame.
6. Reconnect all the cables to their proper posi-
tion at the front side and at the rear side of
the primary power box.
7. Reconnect the main power cable in outlet J3.
8. Set the Customer power supply switch to ON,
and remove the safety panel previously
installed. panel.
9. Switch CB1 ON.
10. Close the front and rear door.
11. Press Power On on the control panel.
12. Referring to Chapter 3, “How to Run 3745
Diagnostics” on page 3-1, run the same diag-
nostic that you ran before you exchanged the
FRU.
13. Go to “Action to Take After a Diagnostic Run
or an FRU Exchange” on page 4-99.
4-76 3745 Models 130 to 17A: MIP