Teledyne 9110T TV Converter Box User Manual


 
Model 9110T NOx Analyzer Instrument Maintenance
Teledyne Analytical Instruments 253
Figure 11-5: NO
2
Converter Assembly
10. Wrap the band heater around the new replacement converter cartridge and tighten
the screws using a high-temperature anti-seize agent (TAI P/N CH42) such as
copper paste.
Ensure to use proper alignment of the heater with respect to the converter
tubes.
11. Replace the Moly converter assembly by routing the cables through the holes in the
converter housing and reconnecting them properly.
12. Reconnect the steel cable clamp around the power leads for safe operation.
13. Reattach the tube fittings to the converter and replace the Moly insulation (top layer
and corner cut out layers).
14. Reinstall the converter assembly cover.