Mitsubishi Electronics FX3G Universal Remote User Manual


 
14 Test Operation, Adjustment, Maintenance and Troubleshooting
14.1 Preparation for Test Operation
202
FX3G Series Programmable Controllers
User's Manual - Hardware Edition
14.1.4 Writing of program and program check [power ON and PLC stopped]
1 Turn on the PLC power.
Make sure that the RUN/STOP switch of the PLC is set to STOP, and turn the power on.
2 Check the program.
Check for circuit errors and grammatical errors with the program check function of the program-
ming tool.
3 Transfer the sequence program.
Write the program to the PLC with the programming tool.
When the memory cassette is used
Make sure to set the PROTECT switch of the memory cassette to
OFF (shown right).
For details on handling of the memory cassette, refer to Chapter 21.
4 Verify the sequence program.
Verify that the program has been correctly written to the PLC.
5 Execute PLC diagnosis.
Check for errors in the PLC main body with the PLC diagnostic function of the programming tool.
For details on the PLC diagnosis with the display module or GX Works2, refer to Section 14.6.
For details on the PLC diagnosis with the GX Developer, refer to GX Developer Version 8
Operating Manual.
For details on the PLC diagnosis with the FX-30P, refer to FX-30P Operation Manual.
PROTECT switch