Teledyne 200EH/EM TV Converter Box User Manual


 
Teledyne API - Model 200EH/EM Operation Manual List of Figures
ix
Figure 5-11: M200EH/EM Ethernet Card.........................................................................................................50
Figure 5-12: M200EH/EM Rear Panel with Ethernet Installed.........................................................................50
Figure 5-13: Alarm Relay Output Pin Assignments..........................................................................................52
Figure 6-6-1: Front Panel Display......................................................................................................................55
Figure 6-6-2: Viewing M200EH/EM TEST Functions........................................................................................58
Figure 6-6-3: Viewing and Clearing M200EH/EM WARNING Messages .........................................................59
Figure 6-6-4: APICOM Graphical User Interface for Configuring the iDAS ......................................................78
Figure 6-6-5: iDAS Configuration Through a Terminal Emulation Program......................................................79
Figure 6-6-6: Back Panel connector Pin-Outs for COM1 & COM2 in RS-232 mode........................................87
Figure 6-6-7: CPU connector Pin-Outs for COM1 & COM2 in RS-232 mode...................................................88
Figure 6-6-8: CPU card Locations of RS-232/486 Switches, Connectors and Jumpers...................................89
Figure 6-6-9: Back Panel connector Pin-Outs for COM2 in RS-485 mode.......................................................90
Figure 6-6-10: CPU connector Pin-Outs for COM2 in RS-485 mode..................................................................90
Figure 6-6-11: Location of JP2 on RS232-Multidrop PCA (option 62) ...............................................................97
Figure 6-6-12: RS232-Multidrop PCA Host/Analyzer Interconnect Diagram ......................................................98
Figure 6-6-13: Analog Output Connector Key.................................................................................................. 110
Figure 6-6-14: Setup for Calibrating Analog Outputs ....................................................................................... 127
Figure 6-6-15: Setup for Calibrating Current Outputs ...................................................................................... 129
Figure 6-6-16: Alternative Setup for Calibrating Current Outputs .................................................................... 129
Figure 6-6-17: Status Output ConnectorTable 6-29: Status Output Pin Assignments..................................... 140
Table 6-29: Status Output Pin Assignments................................................................................................ 141
Figure 6-6-18: Control Inputs with local 5 V power supply............................................................................... 142
Figure 6-6-19: Control Inputs with external 5 V power supply ......................................................................... 142
Figure 6-6-20: APICOM Remote Control Program Interface ........................................................................... 148
Figure 7-1: Gas Supply Setup for Determination of NO
2
Conversion Efficiency......................................... 157
Figure 7-2: Pneumatic Connections–With Zero/Span Valve Option (50) ................................................... 160
Figure 7-3: Pneumatic Connections–With 2-Span point Option (52) –Using Bottled Span Gas ................ 160
Figure7-4: Pneumatic Connections–With Zero/Span Valve Option (50) ................................................... 164
Figure 9-1: Sample Particulate Filter Assembly.......................................................................................... 178
Figure 9-2: Particle Filter on O
3
Supply Air Dryer ....................................................................................... 179
Figure 9-3: Zero Air Scrubber Assembly..................................................................................................... 182
Figure 9-4: NO
2
Converter Assembly.......................................................................................................... 183
Figure 9-5: Reaction Cell Assembly............................................................................................................ 184
Figure 9-6: Critical Flow Orifice Assembly .................................................................................................. 186
Figure 10-10-1: M200EH/EM Sensitivity Spectrum............................................................................................ 190
Figure 10-10-2: NO
2
Conversion Principle ......................................................................................................... 191
Figure 10-10-3: Reaction Cell with PMT Tube ................................................................................................... 192
Figure 10-10-4: Reaction Cell During the AutoZero Cycle................................................................................. 193
Figure 10-10-5: External Pump Pack ................................................................................................................. 195
Figure 10-10-6: Location of Gas Flow Control Assemblies for M200EH............................................................ 197
Figure 10-10-7: Location of Gas Flow Control Assemblies for M200EM ........................................................... 198
Figure 10-10-8: Location of Gas Flow Control Assemblies for M200EH with O
2
sensor Option 65 .................. 198
Figure 10-10-9: Location of Gas Flow Control Assemblies for M200EH with Second Span Point Option 52 ... 199
Figure 10-10-10: Flow Control Assembly & Critical Flow Orifice ......................................................................... 200
Figure 10-10-11: Ozone Generator Principle ....................................................................................................... 202
Figure 10-10-12: Semi-Permeable Membrane Drying Process ........................................................................... 203
Figure 10-10-13: M200EH/EM Perma Pure
®
Dryer.............................................................................................. 204
Figure 10-10-14: Vacuum Manifold ...................................................................................................................... 206
Figure 10-10-15: Dilution Manifold ....................................................................................................................... 208
Figure 10-10-16: M200EH/EM Electronic Block Diagram .................................................................................... 209
Figure 10-10-17: M200EH/EM CPU Board Annotated......................................................................................... 210
Figure 10-10-18: PMT Housing Assembly ........................................................................................................... 212
Figure 10-10-19: Basic PMT Design .................................................................................................................... 212
Figure 10-10-20: PMT Cooling System ................................................................................................................ 213
Figure 10-10-21: PMT Preamp Block Diagram .................................................................................................... 214
Figure 10-10-22: Heater Control Loop Block Diagram......................................................................................... 215
Figure 10-10-23: Thermocouple Configuration Jumper (JP5) Pin-Outs............................................................... 216
Figure 10-10-24: Status LED Locations – Relay PCA......................................................................................... 218
04521C (DCN5731)