1Install and cable a G600 cabinet
Install and cable a G600 cabinet
S8100 Installation and Upgrades 65
November 2003
Install and cable a G600 cabinet
!
WARNING:
Be sure there is adequate ventilation in the area. The internal room temperature must not exceed
50
o
C (122
o
F).
A G600 cabinet can be either floor- or rack-mounted. Set the Carrier Address ID either before or after
installing each G600.
!
WARNING:
It is very important to align the cabinet with the correct holes in the frame because the distance
between each varies. To aid your installation of the rack-mounted cabinet, print a copy of the G600
mounting template provided on this CD. Print the template on 11
× 17paper, so you can use it as
an actual template.
Verify the carrier address ID on G600 cabinets
1 Loosen the thumb screws on the fan assembly and pull it straight out as shown in Figure 3, Fan
assembly removal, on page 65.
Figure 3: Fan assembly removal
2 Verify and, if necessary, set the carrier address ID for each cabinet as shown in Table 4, Carrier
address ID settings, on page 66 and Figure 4, Setting G600 carrier address ID, on page 66.
Cabinet A is the processor cabinet, and Cabinets B, C, and D are optional port carrier cabinets.
(S8100 supports up to three cabinets, A, B, and C.)