Mitsubishi Electronics QD73A1 Universal Remote User Manual


 
119
CHAPTER 7 PROGRAMMING
7
7.3 When Using the Module in a Standard System Configuration
7.3.2 OPR program
7.3.2 OPR program
Programs in this section execute OPR in the near-point dog method or the count method.
(1) Near-point dog method OPR program
This program executes OPR in the near-point dog method. Suppose that fixed parameters and variable
parameters are already set. ( Page 117, Section 7.3.1)
(a) Program detail
The following OPR parameters are written once the CPU module is in the RUN status, and PLC READY
signal (Y2D) turns on.
As X31 is turned on after PLC READY signal (Y2D) turned on, the module executes OPR.
(b) Switch setting
Before executing the program, set "Near-point dog method" to "OPR method setting".
Project window [Intelligent Function Module] [QD73A1] [Switch Setting]
Item Setting detail
OP address
100pulse
OPR speed
5000pulse/s
Creep speed
500pulse/s
Pr.10
Pr.11
Pr.12