Mitsubishi Electronics QD73A1 Universal Remote User Manual


 
153
CHAPTER 7 PROGRAMMING
7
7.4 When Using the Module in a Remote I/O Network
7.4.2 OPR program
(e) Program example
*1 OPR parameters can be set through GX Works2 also. ( Page 108, Section 6.3)
The sequence program that sets OPR parameters is unnecessary when the parameters were set through GX Works2.
Command OPR parameter settings.
OP address (100pulse)
OPR speed (5000pulse/s)
Creep speed (500pulse/s)
Completes the OPR parameter settings.
Turn on/off PLC READY signal.
Command OPR.
Turn on OPR start signal.
Set OPR parameters to the QD73A1.
Command to turn on PLC READY signal.
Turn off OPR start signal.
*1