1 - 13
MELSEC-
A
1 PRODUCT OUTLINE
The following work is carried out with the processes shown on the left page.
Details Reference
1)
Understand the product functions and usage methods, the configuration devices
and specifications required for positioning control, and design the system.
Chapter 1
Chapter 2
Chapter 3
Chapter 8 to Chapter 13
2)
Install the D75P2 onto the DIN rail or enclosure surface, wire the D75P2 and
external connection devices (drive unit, etc.), and connect the D75P2 and
peripheral devices. Check that the D75P2 operates correctly. (Single module test)
Chapter 4
3)
Using the D75P2 software package, set the parameters, positioning data, start
block data and condition data required for the positioning control to be executed.
Chapter 5
Chapter 8 to Chapter 13
AD75 Software Package
Operating Manual
4)
Using the GPP function software package, create the sequence program required
for positioning operation. (When not using the AD75 software package, also create
the sequence program for setting data.)
Chapter 6
GPP Function Software
Package Operating Manual
5)
Write the parameters and positioning data, etc., created with the AD75 software
package into the D75P2.
Chapter 7
AD75 Software Package
Operating Manual
6)
Using the GPP function software package, write the created sequence program into
the PLC CPU. (When not using the AD75 software package, also write in the
sequence program for setting data.)
Chapter 7
GPP Function Software
Package Operating Manual
7)
Carry out test operation and adjustments in the test mode to check the connection
with the D75P2 and external connection device, and to confirm that the designated
positioning operation is executed correctly. (Debug the set "parameters" and
"positioning data", etc.)
AD75 Software Package
Operating Manual
8)
Carry out test operation and adjustment to confirm that the designated positioning
operation is executed correctly. (Debug the created sequence program. When not
using the AD75 software package, also debug the set data.
GPP Function Software
Package Operating Manual
9)
Actually operate the positioning operation. At this time, monitor the operation state
as required. If an error or warning occurs, remedy.
Chapter 5
Chapter 14
AD75 Software Package
Operating Manual
GPP Function Software
Package Operating Manual
10) Service the D75P2 as required.
Chapter 4
11) Dispose of the D75P2.
Chapter 4