Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-744ISDN-TRK (DS1 ISDN Trunk)
3
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port’s NPE channel talks on the selected
time slot and never crosses over to time slots reserved for other connections. If
the NPE is not working correctly, one-way and noisy connections may be
observed. This test is usually only part of a port’s Long Test Sequence and takes
about 20 to 30 seconds to complete.
NOTE:
The TN464C or later UDS1 circuit pack has one SCOTCH-NPE chip instead
of several NPE chips.
Table 3-311. System Technician-Demanded Tests: ISDN-TRK
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
1. D = Destructive, ND = Non-destructive
NPE Crosstalk Test (#6) X ND
Conference Circuit Test (#7) X ND
Audit and Update Test (#36) X X ND
Signaling Link State Check Test (#255) X X ND
Service State Audit Test (#256) X X ND
Call State Audit Test (#257) X X ND
ISDN Test Call Test (#258) X ND
Continued on next page
Table 3-312. TEST #6 NPE Crosstalk Test
Error
Code
Te s t
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1000 ABORT System resources required for this test are not available. The port may be in
use on a valid call. Use status station or status trunk commands to
determine when the port is available for testing.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page