DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-880PE-BCHL (PRI Endpoint Port)
3
Signaling Link State Check Test (#255)
As is noted in the general description for a PRI Endpoint Port, the operation of the
PRI Endpoint Port depends on the health of the UDS1 interface circuit pack and
of the TN765 Processor Interface Link. This test checks the status of those critical
elements.
Table 3-380. TEST #36 Audit and Update Test
Error
Code
Te s t
Result Description/Recommendation
ABORT Internal system error
2000 ABORT Response to the test request was not received within the allowable time
period.
2100 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
FAIL The test failed due to Internal system error.
1. Retry the command at 1-minute intervals a maximum of 5 times.
PASS The port translation has been updated successfully. The current port
states kept in the UDS1 interface circuit pack and in the switch software
are consistent. If the port is busied out, the test does not run, but returns
PASS. To verify that the port is in-service:
1. Enter status pri-endpoint <extension> to verify that the port is
in-service. If the port is in-service, no further action is necessary. If the
port is out-of-service, go to Step 2.
2. Enter the release pri-endpoint <extension> command or the release
port <PCSSpp> command to put the port back into in-service.
3. Retry the test command.
Continued on next page