DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-323test board
2
test board
This command performs a set of hardware diagnostic tests on a specified circuit
pack. The system first validates that the board exists at the specified location.
Then, based on the logical type of board (for example, Analog, Digital, Hybrid,
and others), a series of tests perform diagnostics on the board and then returns
results of the test along with any possible error codes. Some of the tests can be
disabled by administration.
For the R6csi system, the
test board 01A01
command tests all of the
components associated with the processor circuit pack except for environmental
components and system links, which require the
test environment
and test
sys-link
commands, respectively. The processor components are tested in the
following order: PROCR, PR-MEM, SW-CTL, PKTINT, DATA-BD, DATA-CHL,
12V-PWR, CARD-MEM, and PR-MAINT.
Action/
Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
test board
location
short
long
repeat
number
clear
schedule
Physical location of the board
PCSS
Option for a brief series of
nondestructive diagnostic tests.
Option for a longer, more
comprehensive test series
(includes a destructive test)
How many times each test in the
sequence is repeated (1-100)
This option causes the test
sequence (short or long) to repeat
until the alarm (if any) is cleared or
a single test in the sequence fails.
1
Command is validated and then a
scheduling form displays to
schedule execution of the
command. The command is then
placed in the command queue and
is executed at the specified time.
The information displayed by the
command is sent to the system
printer instead of the screen.
2
Examples:
test board 01c11 l
test board 01c11 l schedule
test board 02b15 sh r 2
test board 01c08
test board 02d12 r 4
test board 02d12 c
1 If no alarms are registered against the maintenance object then the test sequence is run only once. The
long
clear
option forces a clear of all alarms if no errors are encountered during testing. The
short clear
option only
clears alarms pertinent to tests in the short sequence. SEE WARNING BELOW.
2 Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
nms
Test
sequence
= short;
repeat = 1
none