Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-287BRI-PORT (ISDN-BRI Port), ABRI-PORT (ASAI ISDN-BRI Port)
3
Layer 1 Transmission Error Counter Test (#624)
This test reads and clears the BRI port’s Layer 1 Transmission error counter
maintained on the BRI-LINE circuit pack. This counter is incremented by the
circuit pack when it detects a Layer 1 transmission problem. The test passes if
the value of the counter is 0 (that is, the error is cleared). If the counter is not zero,
the test fails, and the value of the counter is displayed in the Error Code field.
This error is most likely due to a problem with the wiring or the endpoint or
adjunct (verify that the wiring meets the configuration rules defined in
DEFINITY
Communications System Generic 1 and Generic 3i Wiring
, 555-204-111). It does
not indicate a problem with the ISDN-BRI circuit pack. This test is useful for
verifying the repair of the problem.
Table 3-124. TEST #624 Layer 1 Transmission Error Counter Test
Error
Code
Test
Result Description/ Recommendation
2000 ABORT Response to the test was not received from the circuit pack within the
allowable time period.
1. If the test aborts repeatedly a maximum of 5 times, reset the circuit
pack via the busyout board PCSS and reset board PCSS
commands.
2. If the test aborts again, replace the circuit pack.
2012 ABORT Internal system error
2100 ABORT Could not allocate necessary system resources to run test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
value FAIL The BRI-LINE circuit pack is still detecting errors of this type. The Error
Code field contains the value of this counter.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2. If the test continues to fail, review the results of other tests in the
Long Test Sequence. Pay particular attention to the results of the
Level 1 Status Inquiry test. Follow repair procedures for any of the
executed tests if they fail. Otherwise, go to the next step.
3. If the tests for the endpoints or adjunct pass and the Layer 1
Transmission Error Counter Test continues to fail, check the wiring
to the endpoints or adjunct.
PASS The Layer 1 Transmission error counter was read correctly and has a
value of 0.
Continued on next page