Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-233status bri-port
2
BRI
(cont’d)
0-126 L3-Assigned ext blank Transitory state for BRI endpoints
which support MIM initialization.
2. Wait for five seconds and repeat
the command. If the state has
not changed, continue with Step
2.
3. Make sure SPID administration
on the switch and endpoint are
consistent. Verify the repair by
executing the status bri-port
PCSSpp command. Determine
that the L2 state of the signaling
link is L3-Established.
Otherwise, go to Step 3.
4. Try to replace the endpoint.
Verify the repair by executing
the status bri-port PCSSpp
command. Determine that the
L2 state of the signaling link is
L3-Established.
BRI
(cont’d)
0-126 L3-Assigned ext yes Transitory state for BRI endpoints
which support MIM initialization
when SPID Facility Test initializes
the station.
5. Wait for five seconds and repeat
the command. If the state has
not changed, continue with Step
2.
6. Make sure SPID administration
on the switch and endpoints are
consistent. Verify the repair by
executing the status bri-port
PCSSpp command. Determine
that the L2 state of the signaling
link is L3-Established.
Otherwise, go to Step 3.
7. Try to replace the endpoint.
Verify the repair by executing
the status bri-port PCSSpp
command. Determine that the
L2 state of the signaling link is
L3-Established.
Table 2-3. Status BRI-Port Command Interpretation — Continued
Endpoint
Types
TEI
Range Layer 2 State
Voi ce
Extension
Service
SPID Description / Recommendation
Continued on next page