DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-190release pri-endpoint
2
release pri-endpoint
This command removes PRI endpoint ports (B-channels) associated with
specified PRI endpoint from maintenance busy states. Periodic and scheduled
tests resume on released ports. The switch attempts to negotiate with the far-end
PRI terminal adapter activating PRI endpoint port (B-channel). Maintenance
does background initialization testing on released ports. For details of the test
sequence, refer to [3].
Output
The following example shows the output from the
release pri-endpoint 22501
command and assumes that the PRI endpoint ports for extension 22501 are in
cabinet 1, carrier B, slot 20, circuit 1 to 6.
Field descriptions
Action/Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
release
pri-endpoint
extension
extension number associated with
desired PRI endpoint.
init
inads
craft
nms
none none
Port
Port address (cabinet-carrier-slot-circuit) of released maintenance object.
Maintenance Name
PE-BCHL.
Alt. Name
Alternate way to identify maintenance objects. (PRI endpoint extension)
Result
Success status of a busied out object (PASS, ABORT, FAIL)
Error Code
System-generated description of a command failure.
release pri-endpoint 22501 page 1 of 1
COMMAND RESULTS
Port Maintenance Name Alt. Name Result Error Code
01B2001 PE-BCHL 22501 PASS
01B2002 PE-BCHL 22501 PASS
01B2003 PE-BCHL 22501 PASS
01B2004 PE-BCHL 22501 PASS
01B2005 PE-BCHL 22501 PASS
01B2006 PE-BCHL 22501 PASS
Command Successfully Completed