Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-417CUST-ALM (Customer-Provided Alarming Device)
3
Error Log Entries and Test to Clear Values
System Technician-Demanded Tests: Descriptions
and Error Codes
There are no errors associated with the CPAD CUST-ALM MO. The
test
customer-alarm PC
command is provided to allow a technician to check that the
customer-provided alarming device is correctly installed and functional. It is
recommended that this test be run at least once after both the switch and the
customer alarm have been installed.
Always investigate tests in the order presented in the table below when
inspecting errors in the system. By clearing error codes associated with the
Customer-Provided Alarming Device Test
, for example, you may also clear errors
generated from other tests in the testing sequence.
Customer-Provided Alarming Device Test (#115)
This test closes the relay that activates the CPAD for 1 minute only within the port
network specified. If it takes longer than 1 minute to check that the CPAD has
been activated, the Repeat field on the
test customer-alarm PC
command can
be used to close the relay for up to 99 minutes. Note that when the repeat option
is used, the results for Test #115 come back immediately and, for each test that
passed, the CPAD is kept on for that many minutes. The CPAD does not go off
after 1 minute and then come back on. Instead, the CPAD is kept on continuously
for the entire time. If the CPAD is being activated and deactivated in a flickering
fashion, there is a problem with either the CPAD or the Processor circuit pack.
Error
Type
Aux
Data Associated Test
Alarm
Level
On/Off
Board Test to Clear Value
none none none
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
1. D = Destructive; ND = Nondestructive
Customer-Provided Alarming Device Test (#115) X X ND