Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-920PMS-LINK (Property Management System Link)
3
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below when
inspecting errors in the system. By clearing error codes associated with the
Link
Retry Test
, for example, you may also clear errors generated from other tests in
the testing sequence.
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external PMS
device. If the link has been disconnected already, then this test just returns
"PASS." All resources allocated for a PMS Link are released after this test.
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
1. D = Destructive; ND = Nondestructive
Link Tear Down Test (#213) X D
Link Retry Test (#215) X X ND
Table 3-394. TEST #213 Link Tear Down Test
Error
Code
Test
Result Description/ Recommendation
40
50
ABORT Internal System Error.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1010 ABORT The PMS Link has been busied out and placed in the out-of-service state.
1. Enter release pms-link command to release the PMS Link from busyout
state.
2. Retry test pms long command to execute the test.
FAIL Internal System Error.
1. Retry the command at 1-minute intervals a maximum of 5 times.
PASS The PMS Link is torn down.
Continued on next page