Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-306BRI-SET, ASAI-ADJ, BRI-DAT
3
Table 3-134. TEST #627 BRI Remote Loop Back
Error
Code
Te st
Result Description/ Recommendation
1000 ABORT Could not seize the endpoint or B-channels for test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1005 ABORT The endpoint’s MIMs Supported field is administered to "no."
1. Use the change station extension command to change parameter
only if the endpoint documentation reflects support for ISDN-BRI
Management and Maintenance Procedures.
1113 ABORT The signaling link between the switch and the endpoint is down.
1. Use the test port PCSSpp long command to clear any errors which
prevent establishment of the signaling link.
2. Examine the results of the Signaling Link Status Test (#626) which is
run as part of this command. If this test aborts or fails, follow the repair
procedure for Test #626.
3. If the XID Test continues to abort, escalate the problem.
1139 ABORT The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long PCSSpp
command, and review the results of the BRI Port Local LAN Loop
Around Test to verify the repair.
1141 ABORT The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL (Packet Control Circuit Pack) Maintenance
documentation.
1144 ABORT The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus in the PPN.
2. After completing Step 1, execute the test port long PCSSpp
command, and review the results of the BRI Port Local LAN Loop
Around Test to verify the repair.
Continued on next page