Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-302BRI-SET, ASAI-ADJ, BRI-DAT
3
Note:
a. Execute the
test port long PCSSpp
command and review the results of
the BRI Port Local LAN Loop Around Test to verify the repair.
Signaling Link Status Test (#626)
This test determines the current status of the signaling link. This test passes if the
link is "bound" to an endpoint and fails if the link is "not bound."
The definition of the term "bound" for a link depends upon the type of endpoint
and may depend on the successful completion of procedures at both Layers 2
and 3 of the protocol. The definition of "bound" for each type of endpoint is as
follows:
BRI endpoints administered for MIM (management information
messages) initialization (multipoint):
NOTE:
An MIM is a level 3 message that conveys management and
maintenance information between a communications system and a
BRI terminal.
For endpoints of this type, the signaling link is "bound" when the link is
connected at Layer 2 and the link has been associated with an endpoint,
[that is, the endpoint has completed SPID initialization (L3 established)].
ASAI adjuncts and BRI endpoints not administered for MIM
initialization (point-to-point):
For endpoints of this type, the signaling link is "bound" when the link is
connected at Layer 2 (L2 established).
BRI Vendor ID Test (#631) X (a) ND
BRI Model/Vintage ID Test (#632) X (a) ND
1. D = Destructive, ND = Non-destructive
Table 3-132. System Technician-Demanded Tests: BRI-SET — Continued
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
Continued on next page