Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-309BRI-SET, ASAI-ADJ, BRI-DAT
3
Table 3-135. TEST #628 BRI XID
Error
Code
Te st
Result Description/ Recommendation
1000 ABORT The BRI-SET, ASAI-ADJ, ATT-ADJ, LGATE-AJ, ATTE-AJ is busy. The test
cannot be executed at this time:
1. Pause momentarily (30 seconds) and re-execute at this time.
NOTE:
A BRI-PORT can also be busy. When using this for
BRI-PORT/ABRI-PORT tests, the words "BRI-SET, ASAI-ADJ,
ATT-ADJ, " can be changed to "BRI-PORT, ABRI-PORT, ATT-ADJ."
1005 ABORT The endpoint is not administered to support XID Testing.
1. If the endpoint documentation reflects support XID testing, use the
change station extension command to change the
XID Testing?
field on the form to y.
1113 ABORT The signaling link between the switch and the endpoint is down.
1. Use the test port PCSSpp l command to clear any errors which
prevent establishment of the signaling link.
2. Examine the results of the Signaling Link Status Test (#626) which is
run as part of this command. If this test aborts or fails, follow the repair
procedure for Test #626.
3. If the XID test continues to abort, escalate the problem.
1139 ABORT The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long PCSSpp
command, and review the results of the BRI Port Local LAN Loop
Around Test to verify the repair.
1141 ABORT The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL (Packet Control Circuit Pack) Maintenance
documentation.
1144 ABORT The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus in the PPN.
2. After completing Step 1, execute the test port long PCSSpp
command, and review the results of the BRI Port Local LAN Loop
Around Test to verify the repair.
Continued on next page