Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-934PPP-PT (Control LAN Packet/Port)
3
Table 3-402. TEST #1275 SCOTCH Synchronous Looparound Test
Error
Code
Te st
Result Description/ Recommendation
1000 ABORT The port is in use or PPP link is connected.
1. Determine when the port is available for testing (status clan-port
UUCSSpp).
2. The port may be forced to the idle state by executing a busyout port
UUCSSpp command.
NOTE:
This command is destructive, causing all calls and links using the port
to be torn down.
1002 ABORT No TDM bus timeslots available for the test.
1. Retry the command at 1-minute intervals, up to 5 times.
2. Escalate if the problem persists.
1963 ABORT Firmware indicates that the port is in use or ppp link is connected.
1. Determine when the port is available for testing (status clan-port
UUCSSpp).
2. The port may be forced to the idle state by executing a busyout port
UUCSSpp command.
NOTE:
This command is destructive, causing all calls and links using the port
to be torn down.
2000 ABORT Did not receive circuit pack test response within the allowable time period.
1. If this problem persists, reset the circuit pack (busyout board UUCSS,
reset board UUCSS, and release board UUCSS).
2. If the problem persists, replace the circuit pack.
2012 ABORT Internal system error.
1. Retry the command at 1-minute intervals, up to 3 times.
2. Escalate if the problem persists.
Continued on next page