DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-324test board
2
!
WARNING:
Since the “clear long” options clear all counters if tests pass, it is possible
for firmware counters to be cleared even when a problem exists. In some
cases customer service might degrade since calls may be routed over
defective equipment.
Feature Interactions
Destructive long tests on a Switch Node Interface (SNI) board are not allowed
unless the board has first been busied out.
Output
The following example shows the output from the
test board 1c07 short
command. The responses display on a test-by-test basis with one line of data for
each test result.
test board 01C07 short
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01C07 ANL-BD 51 PASS
01C07 ANL-BD 52 PASS
01C0703 ANL-LINE 35 PASS
01C0703 ANL-LINE 48 PASS
01C0703 ANL-LINE 36 PASS
01C0701 ANL-LINE 35 PASS
01C0701 ANL-LINE 48 PASS
01C0701 ANL-LINE 36 PASS
01C0702 ANL-LINE 35 PASS
01C0702 ANL-LINE 48 PASS
01C0702 ANL-LINE 36 PASS
Command Successfully Completed