Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-55ANL-LINE (8-Port Analog Line), ANL-NE-L (8-Port Neon Analog Line)
3
NPE Crosstalk Test (#6)
One or more NPEs reside on each circuit pack with a TDM Bus interface. The
NPE controls port connectivity and gain, and provides conferencing functions on
a per-port basis. The NPE Crosstalk Test verifies that this port’s NPE channel talks
on the selected time slot and never crosses over to time slots reserved for other
connections. If the NPE is not working correctly, one-way and noisy connections
may be observed. This test is usually only part of a port’s Long Test Sequence
and takes about 20 to 30 seconds to complete.
Table 3-23. System Technician-Demanded Tests: ANL-LINE
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
1. D = Destructive, ND = Non-destructive
Battery Feed Test (#35) X X ND
Station Present Test (#48) X X ND
NPE Crosstalk Test (#6) X ND
Loop Around and Conference Test (#47) X ND
Station Status and Translation Audits and Updates Test (#36) X X ND
Continued on next page
Table 3-24. TEST #6 NPE Crosstalk Test
Error
Code
Te st
Result Description/ Recommendation
1000 ABORT System resources required to run this test are not available. The port may
be busy with a valid call. Use the display port PCSSpp command to
determine the station extension. Use the status station command to
determine the service state of the port. If the service state indicates that
the port is in use, then the port is unavailable for certain tests. (Refer to the
"Status Commands" section in Chapter 8, "Maintenance Commands and
Trouble-Clearing Aids", for a full description of all possible states.) You
must wait until the port is idle before retesting.
1. If the port status is idle, then retry the command at 1-minute intervals a
maximum of 5 times.
Continued on next page