Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-375test station
2
!
WARNING:
Since the “clear long” options clear all counters if tests pass, it is possible
for firmware counters to be cleared even when a problem exists. In some
cases customer service might degrade since calls may be routed over
defective equipment.
Action/
Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
test station
extension
short
long
repeat
number
clear
schedule
The station extension (must
conform to dial-plan)
Option for a brief series of
nondestructive diagnostic tests.
Option for a longer, more
comprehensive series of both
destructive and nondestructive
diagnostic tests.
How many times each test in the
sequence is repeated (1-100)
This option causes the test
sequence (short or long) to repeat
until the alarm (if any) is cleared or
a single test in the sequence fails.
1
Command is validated and then a
scheduling form displays to
schedule execution of the
command. The command is then
placed in the command queue and
is executed at the specified time.
The information displayed by the
command is sent to the system
printer instead of the screen.
2
Examples:
test station 81709 l
test station 85136 s r 2
test station 85036 l r 25
test station 85036 l r 25 schedule
test station 84297 r 4
test station 81709 c
1 If no alarms are registered against the maintenance object then the test sequence is run only once. The
long
clear
option forces a clear of all alarms if no errors are encountered during testing. The
short clear
option only
clears alarms pertinent to tests in the short sequence. SEE WARNING BELOW.
2 Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
cust
nms
Test
Sequence
= short;
Repeat =
1
none