DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-339test environment
2
Feature Interactions
■ The long test recycles power in some specified cabinet on non-SPE and
maintenance board carriers and is destructive. Specifically, the ’a’ carrier
of PPNs does not have power recycled.
■ All port carriers are recycled, and service is interrupted for each port
carrier.
■ If a carrier containing an active tone-clock board is recycled, all ports in
the cabinet or port network will have service disrupted.
Output
The following example shows the output for the
test environment 1
command to
test a PPN cabinet. The responses display on a test-by-test basis with one line of
data for each test result.
Field descriptions
Port
Port address (cabinet-carrier)
Maintenance
Name
The name of maintenance object
Alt. Name
Not applicable
Test No.
The test being executed.
Result
Test result: Pass, Abort, Fail, Disabled
Error Code
Numeric code explaining why the release failed or aborted. Refer
to the detailed list of the codes by test number for each MO.
test environment 1
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01 CABINET 122 PASS
01 EMG-XFER 124 PASS
01 EXT-DEV 120 PASS
01 EXT-DEV 120 PASS
01 RING-GEN 117 PASS
01 RING-GEN 118 PASS
Command Successfully Completed