DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-1274VC-SUMPT
3
Notes:
a. This port has been busied out with the
busyout port PCSSpp
command.
b. The circuit pack has been removed or has been insane for more than 11
minutes. To clear the error, replace or reinsert the circuit pack.
c. The NPE Crosstalk Test(#1103) failed.
d. The VC Summer Port Local TDM Loopback Test(#1100) failed.
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below. By clearing
error codes associated with the
TDM Loopback Test, for example, you may also
clear errors generated from other tests in the testing sequence.
NPE Crosstalk Test (#6)
This test is destructive.
The NPE Crosstalk test verifies that this port’s NPE channel talks on the selected
time slot and never crosses over to time slots reserved for other connections. If
the NPE is not working correctly, one-way and noisy connections may be
observed. This test is part of the port’s long test sequence and takes
approximately 20 to 30 seconds to complete.
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
1. D = Destructive; ND = Nondestructive
NPE Crosstalk Test (#6) (a) X D
TDM Loopback Test (#1100) X X D