Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-379test sys-link
2
Action/
Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
test
sys-link
location
current
faulted
short
long
repeat
number
clear
schedule
Port location associated with the system
link.
Current hardware path tested
Tests the hardware path of the system
link as it was constituted when a fault
last caused the link to go down.
Option for a brief series of
nondestructive diagnostic tests.
Option for a longer, more
comprehensive series of both
destructive and nondestructive
diagnostic tests.
How many times each test in the
sequence is repeated (1-100)
This option causes the test sequence
(short or long) to repeat until the alarm (if
any) is cleared or a single test in the
sequence fails.
1
Command is validated and then a
scheduling form displays to schedule
execution of the command. The
command is then placed in the
command queue and is executed at the
specified time. The information
displayed by the command is sent to the
system printer instead of the screen.
2
Examples:
test sys-link 2e0201 current schedule
test sys-link 2e0201 faulted r 10
1 If no alarms are registered against the maintenance object then the test sequence is run only once. The
long
clear
option forces a clear of all alarms if no errors are encountered during testing. The
short clear
option only
clears alarms pertinent to tests in the short sequence.
2 Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
none