Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Objects
3-952PR-MAINT (Maintenance Processor)
3
Table 3-412. TEST #228 MTP Manager I Loop Around Test
Error
Code
Te st
Result Description/Recommendation
1029
2014
2015
2016
2017
2018
2020
2022
2024
2025
2051
ABORT Refer to STBY-SPE Maintenance documentation for a description of these
error codes.
1000 ABORT The system software resources required for this test are not available.
2000 ABORT Response to the test request was not received within the allowable time
period.
2033
2034
ABORT Internal system error
Port busy
1. Retry the command at 1-minute intervals a maximum of 5 times.
FAIL The Manager I channel failed the Loop Back Test. The Manager I is
probably unusable for administration or maintenance. The EPN
Manager I, if available, or remote access can still be used.
1. Repeat the command at one minute intervals a maximum of 5
times.
2. If the test continues to fail, replace the Processor circuit pack at
your earliest convenience. Refer to Chapter 1 “Reliability
Systems: A Maintenance Aid” for information on how to replace a
circuit pack in the control carrier.
!
WARNING:
If the TN786B circuit pack must be replaced, and if there is a
blank in the Expansion Memory circuit pack slot (that is, in the
slot immediately to the right of the TN786B circuit pack),
remove the blank before removing the circuit pack. Otherwise,
the circuit pack and/or the two connectors that are used to
connect the Expansion Memory circuit pack (if available) might
become damaged.
PASS The Manager I channel passed the Loop Back Test.
1. If the PPN Manager I is not usable, check the Manager I itself,
along with the cabling.
Continued on next page