DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-347test inads-link
2
normal retry mechanism is followed, which means an attempt to make a call to
INADS to report the error takes place 7 minutes later. An INADS trouble ticket is
created only if the connection is successfully established and a message is sent
to the system acknowledging that INADS received the system message.
The
Maintain Process Circuit Packs
field must be set to
yes
on the inads
and technician permission forms. This will provide permissions to execute the
test inads-link
command. This field can be changed by executing a
change
permission login
command.
No alarms are raised on the system and attendant alarm and acknowledgment
lamp states are not changed as a result of the
test inads-link
command. The test
does not run during periodic or scheduled maintenance.
Output
Action/Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
test inads-link
1
2
First OSS telephone number
Second OSS telephone number
Examples:
test inads-link
test inads-link 1
test inads-link 2
init
inads
craft
nms
1st OSS
number
none
Command successfully completed
Test passed
Command failed
Link was up, there was an active alarm that
the switch needs to report, or there was a
problem with the call.
NOTE:
An entry is made in the error log
describing why the inads-link test failed.