Maintenance Objects
3-38ANL-24-L (24-Port Analog Line)
3
NPE Crosstalk Test (#6)
This test verifies that this port’s NPE channel talks on the selected time slot and
never crosses over to time slots reserved for other connections. If the NPE is not
working correctly, one-way and noisy connections may be observed. This test is
usually part of the long test sequence and takes about 20 to 30 seconds to
complete.
Order of Investigation
Short Test
Sequence
Long Test
Sequence
D/ND
1
1. D = Destructive; ND = Nondestructive
Battery Feed Test (#35) X X ND
Station Present Test (#48) X X ND
Looparound Test (#161) X ND
Conference Test (#7) X ND
NPE Crosstalk Test (#6) X ND
Station Status and Translation Audits and Updates
Test (#36)
XXND
Table 3-16. TEST #6 NPE Crosstalk Test
Error
Code
Te st
Result
Description/Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1000 ABORT System resources required to run test are not available. The port may be
busy with a valid call. This result is also reported for the system’s
Music-On-Hold port when it is off-hook, which it usually is.
1. Enter display port PCSSpp to determine the station’s extension.
2. Enter status station extension to determine the service state of the
port.
3. If the port is in use, wait until the port is idle. Retry the command at
1-minute intervals a maximum of 5 times.
1001 ABORT System resources required to run test are not available. This could be due
to a failure to seize the port.
1. Retry the command at 1-minute intervals a maximum of 5 times.