Lucent Technologies 555-233-119 Home Theater Server User Manual


  Open as PDF
of 1872
 
DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-230status bri-port
2
Status bri-port interpretation
Table 2-3 provides information on the status bri-port form.
Endpt SPID
This field displays the SPID administered on the voice/data
endpoint associated with the link. Note that this information is
displayed only if the link is in either the “established”
(point-to-point configuration) or the “13-established” (multipoint
configuration) layer 2 state. Otherwise this field is blank.
Service SPID
Indicates if the link is associated with the Service SPID. If the link
is associated with Service Spuds, the field contains a “yes” and
the endpoint extension field is blank; otherwise, this field is blank.
Service SPID checks building wiring between the switch and the
BRI endpoint.
Table 2-3. Status BRI-Port Command Interpretation
Endpoint
Types
TEI
Range Layer 2 State
Voi ce
Extension
Service
SPID Description / Recommendation
ASAI, BRI 0-126 Assigned blank blank Transitory state for BRI endpoints
and ASAI adjuncts. The switch
attempts link establishment.
1. Check endpoints and wiring by
following SPID Facility Test
Procedures described in the
BRI-SET (ISDN-BRI Set/ASAI
Adjunct) Maintenance
documentation.
2. Verify repairs with status
bri-port PCSSpp. Determine
that L2 state of the signaling link
is “L3-Established” for ASAI
adjuncts and BRI endpoints
supporting MIM (management
information messages)
initialization and “Established”
for fixed TEIBRI endpoints and
automatic TEIBRI endpoints not
supporting MIM initialization.
NOTE:
A MIM is a level-3 message
that conveys management
and maintenance information
between communications
systems and BRI terminals.
Continued on next page